Construction Begins for Phase 1B

Scott Osborn ’94

August 15, 2016

With students returning to campus on Aug. 25, construction of the new grades 2 – 5 neighborhood has shifted from Phase 1a to Phase 1b, which includes the remaining studios for grades 2 – 5 and the K – 8 Learning Commons.

20160815_ConstructionUpdate_02.jpg

The construction wall that was originally in place for phase 1a has been moved to protect students as the Winne Units are deconstructed and the new buildings are erected. Please refer to the newly updated campus map for details on the new construction area. Note that access to Thurston Memorial Chapel from the former grades 2 – 5 dropoff on Piper’s Pali will be closed after mid-September.

Comments

No comments posted.

Post a Comment

Related News